CNH WX168 WX188 WE170B WE190B Wheeled Excavator 84541350 84541351 84541352 84541366 8454136 Installation Instructions Manual 84542500 EN_DE_IT_FR – PDF DOWNLOAD
DESCRIPTION:
CNH WX168 WX188 WE170B WE190B Wheeled Excavator 84541350 84541351 84541352 84541366 8454136 Installation Instructions Manual 84542500 EN_DE_IT_FR – PDF DOWNLOAD
84541350 – ADD-ON NIBBLER AND BREAKER
CASE CONSTRUCTION
WX188
NEW HOLLAND CONSTRUCTION
WE190B
84541351 – ADD-ON NIBBLER AND BREAKER
CASE CONSTRUCTION
WX188
NEW HOLLAND CONSTRUCTION
WE190B
84541352 – ADD-ON NIBBLER AND BREAKER
CASE CONSTRUCTION
WX188
NEW HOLLAND CONSTRUCTION
WE190B
84541366 – ADD-ON NIBBLER AND BREAKER
CASE CONSTRUCTION
WX188
NEW HOLLAND CONSTRUCTION
WE190B
84541367 – ADD-ON NIBBLER AND BREAKER
CASE CONSTRUCTION
WX188
NEW HOLLAND CONSTRUCTION
WE190B
84541368 – ADD-ON NIBBLER AND BREAKER
CASE CONSTRUCTION
WX188
NEW HOLLAND CONSTRUCTION
WE190B
84581217 – ADD-ON NIBBLER AND BREAKER
CASE CONSTRUCTION
WX168
NEW HOLLAND CONSTRUCTION
WE170B
84581218 – ADD-ON NIBBLER AND BREAKER
CASE CONSTRUCTION
WX168
NEW HOLLAND CONSTRUCTION
WE170B
Tor – 84542500
84542500
Issue date May 2014
EN
84581219 – ADD-ON NIBBLER AND BREAKER
CASE CONSTRUCTION
WX168
NEW HOLLAND CONSTRUCTION
WE170B
84581227 – ADD-ON NIBBLER AND BREAKER
CASE CONSTRUCTION
WX168
NEW HOLLAND CONSTRUCTION
WE170B
84581228 – ADD-ON NIBBLER AND BREAKER
CASE CONSTRUCTION
WX168
NEW HOLLAND CONSTRUCTION
WE170B
84581229 – ADD-ON NIBBLER AND BREAKER
CASE CONSTRUCTION
WX168
NEW HOLLAND CONSTRUCTION
WE170B
PRE-ASSEMBLY
PREPARING FOR ASSEMBLY
Preparation
Before performing the operations to install the nibbler and
breaker system, proceed as follows:
1. Park the machine on a level surface.
2. Position the front attachment as indicated in figure.
3. Lower the blade and the stabilizers to the ground.
4. Lock the upper structure.
5. Apply the parking brake.
6. Turn the rotary dial to 1st detent (LOW IDLE) and shut
off the engine.
7. To allow all cylinders to release pressure set the starter
switch key again to position I, move both hydraulic control
hand levers and the pedal in all directions. Press
the brake pedal to discharge the accumulators of brake
system.
8. Rest the bucket to the ground.
9. Place the safety lever in “LOCK” position.
10. Set the starter switch key to position 0 and pull it out.
11. Place some wedges under the wheels so as to prevent
the machine from moving.
12. Wait for the machine to cool off.
IMAGES PREVIEW OF THE MANUAL:
TABLE OF CONTENTS:
CNH WX168 WX188 WE170B WE190B Wheeled Excavator 84541350 84541351 84541352 84541366 8454136 Installation Instructions Manual 84542500 EN_DE_IT_FR – PDF DOWNLOAD
1 SAFETY INFORMATION
Safety rules . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1-1
2 KIT CONTENT
Kit overview. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2-1
3 PRE-ASSEMBLY
PREPARING FOR ASSEMBLY
Preparation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3-1
4 ASSEMBLY
Hydraulic breaker and Nibbler attachment
Hammer shears selection valve – Install. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-1
Hammer shears pilot valve hoses – Install. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-2
Hammer system lines – Install Monoboom version . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-5
Hammer system lines – Install Triple articulation version . . . . . . . . . . . . . . . . . . . . . . . . . . 4-7
Hammer shears boom lines – Install Monoboom version . . . . . . . . . . . . . . . . . . . . . . . . . 4-10
Hammer shears boom lines – Install Triple articulation version . . . . . . . . . . . . . . . . . . . 4-14
Dipper lines installation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-17
Bucket cylinder – Install Check valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-21
Electronic pedal – Install Monoboom version . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-22
Electronic pedal – Install Triple articulation version . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-23
Switches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4-24
PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contact [email protected]
S.V