Sakai Vibrating Roller GW750 Operating & Maintenance Manual – PDF DOWNLOAD
FILE DETAILS:
Sakai Vibrating Roller GW750 Operating & Maintenance Manual – PDF DOWNLOAD
Language : English
Pages :76
Downloadable : Yes
File Type : PDF
TABLE OF CONTENTS:
Sakai Vibrating Roller GW750 Operating & Maintenance Manual – PDF DOWNLOAD
PREFACE
MACHINE AND ENGINE IDENTIFICATION NUMBERS 1
SAFETY NOTICES ,; 2
1 BASIC PRECAUTIONS FOR SAFETY 4
11 General Precautions
12 Preparation for Safe Operation 6
13 Before Starting the Engine 7
14 After Starting the Engine 8
15 During operation 8
16 Loading and Unloading 10
17 Transportation 11
18 Handling the Battery 11
19 Towing 12
110 Before Servicing 13
111 During Servicing 14
112 Safety Decals 16
2 OPERATION 18
21 Instruments and Controls 18
211 Operator’s station 18
212 Gauges, indicator lamps and warning lamps 19
213 Switches 21
214 Operating levers and pedals 26
215 Unloader valve 27
216 Fuse box 28
22 Handling and Adjustments 28
221 Awning 28
222 Seat adjustment 29
223 Disengaging the brake when towing 29
23 Operation 30
231 Before-starting inspection 30
232 Starting the engine 31
233 After starting the engine 32
234 Traveling 33
235 Stopping / Parking 34
236 Stopping the Engine 35
237 Check after Stopping the Engine 35
24 Vibratory Operation 36
CONTENTS
25 Sprinkler
36
26 Liquid Sprayer
39
27 Precautions for Work
41
271 Compaction operation
41
272 When going downhill
41
273 On a slope
41
28 Applicable Jobs
42
29 After Operation
42
210 Loading and Unloading
43
2101 Use of a trailer equipped with a winch
43
2102 Self-propelling
44
211 After Loading the Machine
45
212 Transportation
45
213 Operation in Cold Weather
45
2131 Fuel oil and grease
45
2132 Coolant
46
2133 Battery
47
214 When the Cold Season is Over
48
215 For a Long Storage Period
48
216 During the Storage Period
48
217 When the Battery Has Discharged
49
2171 Connection and disconnection of booster cables
49
3 PERIODICAL MAINTENANCE
51
31 Precautions
51
32 Walk-Around Checking
53
33 Periodical Maintenance Points
54,
34 Maintenance Procedure
56
(1) Every 10 hours or daily
56
(2) Every 50 hours
57
(3) Every 250 hours
58
(4) Every 500 hours
61
(5) Every 1000 hours
62
(6) As required
64
35 Feeding Water and Lubricants
66
36 Electric Wiring Diagram
68
4 SPECIFICATIONS
70
IMAGES PREVIEW OF THE MANUAL:
S.M 5/24