KOMATSU PC8000E-6 HYDRAULIC MINING SHOVEL ASSEMBLY AND TRANSPORT MANUAL AM12107up-EN-7 – PDF DOWNLOAD
DESCRIPTION:
KOMATSU PC8000E-6 HYDRAULIC MINING SHOVEL ASSEMBLY AND TRANSPORT MANUAL AM12107up-EN-7 – PDF DOWNLOAD
SERIAL NUMBER 12107 and up
SAFETY:
SAFETY INFORMATION:
- To enable you to use this machine safely, and to prevent injury to operators, service personnel or bystanders, the precautions and warnings included in this manual and the safety signs attached to the machine must always be followed. The safety information in this manual does not replace any safety rules or laws in your area.
- To identify important safety messages in the manual and on the machine labels, the following signal words are used. The “Safety Alert Symbol” identifies important safety messages on machines, in manuals, and elsewhere. When you see this symbol, be alert to the risk of personal injury or death. Follow the instructions in the safety message.
TABLE OF CONTENTS:
KOMATSU PC8000E-6 HYDRAULIC MINING SHOVEL ASSEMBLY AND TRANSPORT MANUAL AM12107up-EN-7 – PDF DOWNLOAD
2 SAFETY 11
2 1 SAFETY INFORMATION 12
2 2 OVERVIEW 13
2 2 1 NORMAL OPERATIONS 13
2 2 2 REGULAR MAINTENANCE 13
2 2 3 TROUBLESHOOTING, ADJUSTMENTS AND REPAIR 13
2 2 4 ADDITIONAL SAFETY PRECAUTIONS FOR ASSEMBLING, DISASSEMBLING AND TRANSPORTATION OF THE EXCAVATOR 13
2 3 SOUND PRESSURE LEVEL IN THE OPERATOR’S CAB 14
2 4 GENERAL PRECAUTIONS COMMON TO OPERATION ON THE EXCAVATOR 15
2 4 1 UNDERSTANDING THE MACHINE 15
2 4 2 PRECAUTIONS BEFORE STARTING OPERATION ON THE EXCAVATOR 15
2 4 3 PREPARATIONS FOR SAFE OPERATION 15
2 4 4 FIRE PREVENTION 17
2 4 5 PRECAUTIONS WHEN GETTING ON OR OFF THE MACHINE 19
2 4 6 BURN PREVENTION 21
2 4 7 PRECAUTIONS WHEN CLEANING CAB GLASS 21
2 4 8 PRECAUTIONS RELATED TO PROTECTIVE STRUCTURES 22
2 4 9 ELECTROMAGNETIC COMPATIBILITY (EMC) 23
2 4 10 PRECAUTIONS AT JOBSITE 24
2 4 11 STARTING ENGINE 29
2 4 12 OPERATION 30
2 5 PRECAUTION FOR MAINTENANCE 36
2 5 1 GENERAL PRECAUTIONS 36
2 5 2 PRECAUTIONS FOR INSPECTION AND MAINTENANCE 44
2 5 3 PRECAUTIONS WITH HIGH PRESSURE FLUID 45
2 6 ADDITIONAL SAFETY INFORMATION FOR TROUBLESHOOTING AND ADJUSTMENTS 49
2 6 1 INSPECTION OF THE HYDRAULIC SYSTEM 49
2 6 2 TWO WORKERS ONLY WHEN THE MACHINE IS RUNNING DURING ADJUSTMENTS 49
2 6 3 AREAS OF POTENTIAL DANGER AROUND THE EXCAVATOR 49
2 7 SPECIAL SAFETY EQUIPMENT 50
2 7 1 FRONT GUARD PROTECTIVE STRUCTUR ’FOPS’ FOR OPERATOR’S CAB 51
2 7 2 OBJECT HANDLING 51
2 7 3 LIGHTING 51
2 7 4 WARNING BEACON 51
2 7 5 SAFETY HARNESS IN CONFORMITY WITH EN 361 (EUROPEAN STANDARD) 51
2 8 ADDITIONAL SAFETY PRECAUTIONS 59
2 8 1 WHEN ASSEMBLING THE EXCAVATOR 59
2 8 2 WHEN DISASSEMBLING THE EXCAVATOR 59
2 8 3 WHEN TRANSPORTING THE DISASSEMBLED EXCAVATOR 60
3 GENERAL 61
3 1 GENERAL 62
3 1 1 DELIVERY OF THE EXCAVATOR 62
3 1 2 ASSEMBLING THE EXCAVATOR 62
3 1 3 LIFTING AND TRANSPORTATION 62
3 1 4 ELECTRICAL ENERGY 63
3 1 5 ELECTROMAGNETIC COMPATIBILITY (EMC) 63
3 1 6 MONITORING SYSTEM OF THE MACHINE 63
3 2 ASSEMBLY SITE REQUIREMENTS 64
3 2 1 CONFIGURATION OF COMPONENTS ON ERECTION SITE (EXAMPLE) 64
3 2 2 REQUIRED CRANES 65
3 2 3 MANPOWER / ASSEMBLY TIME 65
3 2 4 TOOLS AND EQUIPMENT FOR ASSEMBLY 66
3 2 5 STANDARD APPLICATION TORQUE CHART 69
3 2 6 PREPARATIONS FOR ASSEMBLY 72
3 3 LIFTING OF THE MAIN COMPONENTS 74
3 3 1 SAFETY PRECAUTIONS FOR LIFTING OF COMPONENTS 75
3 3 2 LIFTING ATTACHMENT POINTS AND WEIGHTS 75
3 3 3 CRAWLER SIDE FRAME WITHOUT TRACKS 75
3 3 4 CARBODY 77
3 3 5 SUPERSTRUCTURE PLATFORM 79
3 3 6 MACHINERY HOUSE 81
3 3 7 FACE SHOVEL BOOM 83
3 3 8 BACKHOE BOOM 85
3 3 9 COUNTERWEIGHT LIFTING FOR HORIZONTAL TRANSPORT 87
3 3 10 COUNTERWEIGHT ERECTING FOR VERTICAL TRANSPORT 89
3 3 11 COUNTERWEIGHT LIFTING FOR VERTICAL TRANSPORT 91
3 3 12 HIGH VOLTAGE SWITCH CABINET 93
3 3 13 CAB BASE 95
3 3 14 MAIN HYDRAULIC OIL RESERVOIR 97
3 3 15 FACE SHOVEL STICK 99
3 3 16 BACKHOE STICK 101
3 3 17 FACE SHOVEL BACK WALL 103
3 3 18 FACE SHOVEL CLAM SHELL 105
3 3 19 BACKHOE BUCKET 107
3 3 20 BASIC DIMENSIONS 108
3 4 GENERAL INSTALLATION PROCEDURES FOR HYDRAULIC HOSE LINES 110
4 ASSEMBLY SEQUENCE 113
4 1 ASSEMBLY SEQUENCE OF FACE SHOVEL MACHINES 114
4 1 1 ASSEMBLY SEQUENCE UNDER CONSIDERATION OF THE MACHINE’S STABILITY 115
4 1 2 STABILITY IN RELATION TO ASSEMBLY STAGE 116
4 2 ASSEMBLY SEQUENCE OF BACKHOE MACHINES 122
4 2 1 ASSEMBLY SEQUENCE UNDER CONSIDERATION OF THE MACHINE’S STABILITY 123
4 3 ASSEMBLY OF UNDERCARRIAGE 124
4 3 1 ASSEMBLY OF TRACKS 125
4 3 2 ATTACH CARBODY TO SIDE FRAME 126
4 3 3 DETERMINING THE TIGHTENING TORQUE 131
4 3 4 SPECIAL HYDRAULIC TORQUE WRENCH 135
4 3 5 MOUNTING OF TRAVEL GEARS AND FINAL DRIVES 136
4 3 6 MOUNTING OF TRAVEL GEARS WITH PROTECTION KIT 140
4 3 7 CLOSING THE TRACKS 142
4 3 8 CONNECT HYDRAULIC LINES TO THE TRAVEL MOTORS 143
4 3 9 HYDRAULIC TRACK TENSIONING SYSTEM 146
4 4 MOUNTING OF THE CABLE DRUM 148
4 5 MOUNTING OF THE CABLE GUIDE 150
4 6 MOUNTING OF THE SWING CIRCLE 152
4 7 MOUNTING SUPERSTRUCTURE PLATFORM ONTO UNDERCARRIAGE 158
4 7 1 CONNECT GREASE LINES TO THE ROTARY JOINT 165
4 7 2 INSTALLATION OF SLEW ANGLE WARNING SYSTEM 166
4 8 CONNECTING HYDRAULIC LINES TO THE ROTARY JOINT 172
4 9 MOUNTING MACHINERY HOUSE ONTO THE SUPERSTRUCTURE PLATFORM 174
4 10 MOUNTING OF THE REAR ACCESS LADDER 176
4 10 1 MOUNTING OF THE SWITCHING VALVE FOR EMERGENCY LOWERING OF THE ACCESS LADDER 178
4 11 MOUNTING OF THE LATERAL ACCESS LADDER 182
4 12 PRE-ASSEMBLY OF FACE SHOVEL BOOM 186
4 12 1 ATTACHMENT POINTS FOR SAFETY HARNESS ON BOOM 188
4 12 2 GENERAL INSTALLATION INSTRUCTIONS FOR ATTACHMENT PINS 190
4 12 3 ATTACH BOOM CYLINDERS AND STICK CYLINDERS TO THE BOOM 192
4 12 4 PREASSEMBLY OF HOSES 195
4 13 ATTACH BOOM TO SUPERSTRUCTRE A-FRAME 198
4 13 1 INSTALLATION OF BOOM ARC HOSES 200
4 14 PRE-ASSEMBLY OF BACKHOE BOOM 202
4 14 1 ATTACHMENT POINTS FOR SAFETY HARNESS ON BOOM 204
4 14 2 ATTACH BOOM CYLINDERS AND STICK CYLINDERS TO THE BOOM 206
4 14 3 ATTACH BOOM TO SUPERSTRUCTRE A-FRAME 212
4 14 4 INSTALLATION OF BOOM ARC HOSES 215
4 15 MOUNTING OF THE COUNTERWEIGHT 216
4 16 MOUNTING OF THE HIGH VOLTAGE CABINET 218
4 17 HIGH VOLTAGE INTERLOCK SAFETY SWITCHES 220
4 17 1 HIGH VOLTAGE INTERLOCK SAFETY SWITCHES ON CABLE DRUM 221
4 17 2 HIGH VOLTAGE INTERLOCK SAFETY SWITCHES ON CABLE GUIDE 223
4 18 CONNECT HIGH VOLTAGE CABLES AND CONTROL CABLES ON MACHINES WITH CABLE DRUM 224
4 19 CONNECT HIGH VOLTAGE CABLES ON MACHINES WITH CABLE GUIDE 228
4 20 MOUNTING OF THE CAB BASE 230
4 20 1 CABLE CONNECTIONS ON CAB BASE BOTTOM 232
4 20 2 CONNECT THE FIRE SUPPRESSION SYSTEM PIPING BETWEEN CAB BASE AND HIGH VOLTAGE CABINET 236
4 20 3 INSTALL CAB STAIR AND RAILINGS 238
4 21 ATTACHING THE CAB WITH SUPPORT FRAME TO THE CAB BASE 240
4 21 1 CABLE CONNECTIONS ON CAB BASE ROOF 242
4 21 2 CONNECTING THE AIR CONDITIONER HOSES OF THE CAB 244
4 21 3 INSTALL ORBCOMM ANTENNA 246
4 21 4 INSTALL THE EMERGENCY ESCAPE LADDER ON CAB 248
4 22 MOUNTING OF FRONT ROOF AND COVERING 250
4 23 ATTACHING THE HYDRAULIC OIL RESERVOIR 252
4 23 1 INSTALL THE COMPENSATOR BETWEEN MAIN AND SUCTION OIL RESERVOIR 254
4 24 ATTACHING THE HYDRAULIC OIL COOLER 256
4 24 1 CONNECTING THE HOSE LINES TO THE COMBINED OIL COOLER FOR HYDRAULIC OIL AND PTO GEAR OIL 258
4 24 2 INSTALL AUXILIARY HYDRAULIC OIL COOLER 262
4 24 3 CONNECTING THE HYDRAULIC HOSE LINES OF MAIN OIL COOLER FAN DRIVE CIRCUIT 264
4 24 4 CONNECTING THE HYDRAULIC HOSE LINES OF AUXILIARY OIL COOLER CIRCUIT 266
4 24 5 CONNECTING THE HYDRAULIC HOSE LINES OF AUXILIARY OIL COOLER FAN MOTORS 268
4 24 6 CONNECTING THE RETURN AND PRESSURE OIL HOSE LINES OF MAIN CONTROL VALVES 270
4 24 7 CONNECTING THE HOSE LINES OF THE TRANSFER PUMP 272
4 25 ATTACHING THE HANDRAILS, CATWALKS AND STEPS 274
4 26 ATTACHING THE CENTRAL LUBRICATION UNIT 278
4 26 1 CONNECTING THE HYDRAULIC LINES AND GREASE LINES 280
4 26 2 INSTALL LUBRICATION PINIONS OF SWING CIRCLE 282
4 26 3 CONNECT CABLE HARNESS OF CENTRAL LUBRICATION UNIT 284
4 26 4 CONNECTING GREASE LINES OF THE CENTRAL LUBRICATION SYSTEM 286
4 27 CENTRAL REFILLING SYSTEM 288
4 27 1 CONNECTING THE REFILLING LINES 289
4 28 MOUNTING CAN-NODE BOXES ON MACHINERY HOUSE ROOF 292
4 28 1 CONNECTING THE CABLES TO THE CAN-NODES 293
4 29 ATTACHING THE SERVICE CRANE (IF SO EQUIPPED) 294
4 29 1 ELECTRO-HYDRAULIC VERSION 295
4 29 2 ELECTROMECHANIC VERSION 297
4 30 PRE-CHECKS PRIOR TO INITIAL START UP 298
4 31 HIGH VOLTAGE INTERLOCK SYSTEM 300
4 31 1 APPLYING HIGH VOLTAGE CURRENT ON MACHINES WITH CABLE DRUM 301
4 31 2 APPLYING HIGH VOLTAGE CURRENT ON MACHINES WITH CABLE GUIDE 304
4 32 CHECKING DIRECTION OF MOTOR ROTATION 308
4 33 CHECK AND ADJUST ALIGNMENT OF MAIN MOTORS 310
4 33 1 ALIGNMENT TOLERANCES 317
4 33 2 SHIM SETS 317
4 33 3 RECOMMENDED TOOLS FOR MOTOR ALIGNMENT 319
4 34 FILLING AND BLEEDING THE HYDRAULIC SYSTEM 320
4 34 1 FILLING THE HYDRAULIC SYSTEM 321
4 34 2 BLEEDING THE HYDRAULIC SYSTEM 322
4 35 BLEEDING GEAR PUMPS FOR PTO GEAR LUBRICATION 328
4 36 ASSEMBLY FACE SHOVEL ATTACHMENT 330
4 36 1 ATTACHING THE BUCKET CYLINDERS TO THE BOOM 331
4 36 2 ATTACHING THE STICK TO THE BOOM 333
4 36 3 CONNECTING HOSE LINES TO BUCKET CYLINDERS 335
4 36 4 CONNECTING STICK CYLINDERS TO THE STICK 336
4 37 BLEEDING THE HYDRAULIC CIRCUITS 338
4 37 1 BLEEDING THE SWING PARKING BRAKE CIRCUIT 339
4 37 2 BLEEDING THE TRAVEL GEAR PARKING BRAKE CIRCUIT 339
4 37 3 BLEEDING THE HYDRAULIC TRACK TENSIONING CIRCUIT 341
4 37 4 BLEEDING HYDRAULIC CIRCUIT OF ACCESS LADDER 342
4 37 5 BLEEDING HYDRAULIC CIRCUIT OF SERVICE ARM 342
4 37 6 BLEEDING HYDRAULIC CIRCUIT OF ATTACHMENT CYLINDERS 342
4 37 7 BLEEDING HYDRAULIC CIRCUIT OF SWING MOTORS 343
4 38 ATTACHING FACE SHOVEL TO THE STICK 344
4 38 1 ATTACHING BUCKET BACK WALL TO THE STICK 345
4 38 2 CONNECTING HOSE LINES FROM STICK TO BUCKET CLAM CYLINDERS 347
4 38 3 ATTACHING THE CLAM SHELL TO BUCKET BACK WALL 349
4 38 4 CONNECTING GREASE LINES OF THE FACE SHOVEL ATTACHMENT 351
4 38 5 CONNECTING GREASE LINES ON THE BUCKET 353
4 38 6 BLEEDING HYDRAULIC CIRCUIT OF BUCKET CLAM CYLINDERS 353
4 39 ATTACHING THE BACKHOE STICK TO THE BOOM 354
4 39 1 ATTACHING THE STICK TO THE BOOM 355
4 39 2 CONNECTING HOSE LINES FROM BOOM TO BUCKET CYLINDERS 357
4 40 BLEEDING THE HYDRAULIC CIRCUITS 358
4 40 1 BLEEDING THE SWING PARKING BRAKE CIRCUIT 359
4 40 2 BLEEDING THE TRAVEL GEAR PARKING BRAKE CIRCUIT 359
4 40 3 BLEEDING THE HYDRAULIC TRACK TENSIONING CIRCUIT 361
4 40 4 BLEEDING HYDRAULIC CIRCUIT OF ACCESS LADDER 362
4 40 5 BLEEDING HYDRAULIC CIRCUIT OF SERVICE ARM 362
4 40 6 BLEEDING HYDRAULIC CIRCUIT OF ATTACHMENT CYLINDERS 362
4 40 7 BLEEDING HYDRAULIC CIRCUIT OF SWING MOTORS 363
4 41 ATTACHING BACKHOE BUCKET TO THE STICK 364
4 41 1 CONNECTING GREASE LINES OF THE BACKHOE ATTACHMENT 369
4 42 BLEEDING HYDRAULIC CIRCUITS OF THE TRAVEL MOTORS 370
5 FINAL CHECKS AND ADJUSTMENTS 371
5 0 1 COMMISSIONING CHECK LIST 373
5 0 2 ADJUSTMENT OF AUTOMATIC LUBRICATION SYSTEMS 373
5 0 3 MAIN PUMP ADJUSTMENT IN RELATION TO ALTITUDE AT THE MINE SITE 375
5 0 4 PRESSURE COMPENSATION OF SEALED COMPONENTS 375
5 1 FINAL ADJUSTMENT OF SLEW ANGLE WARNING SYSTEM 376
5 2 PLACING THE FIRE DETECTION AND SUPPRESSION SYSTEM IN SERVICE 378
5 2 1 CONNECTING THE FIRE SUPPRESSION SYSTEM HOSE TO THE CARBON DIOXIDE CYLINDER 383
5 2 2 ELECTRIC FIRE DETECTION AND ACTUATION SYSTEM 385
5 2 3 PROTRACTING ACTUATION DEVICE (PAD) 388
5 2 4 TESTING AND TROUBLE SHOOTING OF THE CHECKFIRE RELEASE CIRCUIT 391
5 2 5 INSTALL THE PROTRACTING ACTUATION DEVICE (PAD) IN THE MANUAL/AUTOMATIC ACTUATOR 401
5 2 6 CONTROL MODULE – LED INDICATIONS 402
5 2 7 MAINTENANCE SCHEDULE OF THE CO2 SYSTEM 403
5 3 COMMISSIONING OF THE AIR CONDITIONING 404
5 3 1 AIR CONDITIONING FOR OPERATOR’S CAB 407
5 3 2 AIR CONDITIONING FOR MEDIUM AND HIGH VOLTAGE SWITCH CABINETS 409
5 4 PERFORM THE PM-CLINIC PROCEDURE ACCORDING TO THE PM-CLINIC MANUAL 415
5 4 1 VISUAL INSPECTION 416
5 4 2 TRAVELLING INSTRUCTIONS 416
5 5 HANDLING OF DOCUMENTATION AFTER ASSEMBLY AND COMMISSIONING 417
6 ORBCOMM INITIALIZATION 419
6 1 ORBCOMM TERMINAL ACTIVATION 420
6 1 1 APPLICATION FORM FOR TERMINAL ACTIVATION 421
6 2 WEBCARE BASIC INFORMATION FOR MACHINE REGISTRATION 422
7 DISASSEMBLY OF THE MACHINE 425
7 1 SAFETY PRECAUTIONS FOR DISASSEMBLING THE MACHINE 427
7 2 GROUNDING PROCEDURE OF THE HIGH VOLTAGE SYSTEM ON MACHINES WITH CABLE DRUM 429
7 3 GROUNDING PROCEDURE OF THE HIGH VOLTAGE SYSTEM ON MACHINES WITH CABLE GUIDE 436
7 3 1 DISASSEMBLY SEQUENCE OF FACE SHOVEL MACHINES 444
7 3 2 DISASSEMBLY SEQUENCE OF BACKHOE MACHINES 446
7 3 3 DISPOSAL OF WASTE MATERIAL 448
7 3 4 LIFTING AND TRANSPORTATION OF MAIN COMPONENTS 448
8 LIFTING AND TRANSPORTATION OF MAIN COMPONENTS 449
8 1 LIFTING OF THE MAIN COMPONENTS 450
8 1 1 SAFETY PRECAUTIONS FOR LIFTING OF COMPONENTS 451
8 1 2 LIFTING ATTACHMENT POINTS AND WEIGHTS 451
8 1 3 CRAWLER SIDE FRAME WITHOUT TRACKS 451
8 1 4 CARBODY [DIESEL DRIVE] 453
8 1 5 CARBODY [ELECTRIC DRIVE] 455
8 1 6 SUPERSTRUCTURE PLATFORM 457
8 1 7 MACHINERY HOUSE [DIESEL DRIVE] 459
8 1 8 MACHINERY HOUSE [ELECTRIC DRIVE] 461
8 1 9 FACE SHOVEL BOOM 463
8 1 10 BACKHOE BOOM 465
8 1 11 COUNTERWEIGHT LIFTING FOR HORIZONTAL TRANSPORT 467
8 1 12 COUNTERWEIGHT ERECTING FOR VERTICAL TRANSPORT 469
8 1 13 COUNTERWEIGHT LIFTING FOR VERTICAL TRANSPORT 471
8 1 14 FUEL TANK [DIESEL DRIVE] 473
8 1 15 HIGH VOLTAGE SWITCH CABINET [ELECTRIC DRIVE] 475
8 1 16 CAB BASE 477
8 1 17 MAIN HYDRAULIC OIL RESERVOIR 479
8 1 18 FACE SHOVEL STICK 481
8 1 19 BACKHOE STICK 483
8 1 20 FACE SHOVEL BACK WALL 485
8 1 21 FACE SHOVEL CLAM SHELL 487
8 1 22 BACKHOE BUCKET 489
8 2 TRANSPORTATION OF THE MAIN COMPONENTS 490
8 2 1 SAFETY PRECAUTIONS FOR TRANSPORTATION OF THE MAIN COMPONENTS 490
8 2 2 TIE-DOWN OF UNPACKED EXCAVATOR TRANSPORT UNITS 490
8 2 3 CRAWLER TRACKS [1900 mm] 493
8 2 4 CRAWLER TRACKS [1500 mm] 495
8 2 5 CRAWLER SIDE FRAME WITHOUT TRACKS 497
8 2 6 CARBODY [DIESEL DRIVE] 499
8 2 7 CARBODY [DIESEL DRIVE] 501
8 2 8 CARBODY [ELECTRIC DRIVE] 503
8 2 9 CARBODY [ELECTRIC DRIVE] 505
8 2 10 SUPERSTRUCTURE PLATFORM 507
8 2 11 MACHINERY HOUSE [DIESEL DRIVE] 509
8 2 12 MACHINERY HOUSE [ELECTRIC DRIVE] 511
8 2 13 FACE SHOVEL BOOM 513
8 2 14 BACKHOE BOOM 515
8 2 15 COUNTERWEIGHT 517
8 2 16 FUEL TANK [DIESEL DRIVE] 519
8 2 17 HIGH VOLTAGE SWITCH CABINET [ELECTRIC DRIVE] 521
8 2 18 CAB BASE 523
8 2 19 MAIN HYDRAULIC OIL RESERVOIR 525
8 2 20 FACE SHOVEL STICK 527
8 2 21 BACKHOE STICK 529
8 2 22 FACE SHOVEL BACK WALL 531
8 2 23 FACE SHOVEL CLAM SHELL 533
8 2 24 BACKHOE BUCKET 535
8 2 25 COMPONENTS DELIVERED IN TRANSPORT BOXES 535
IMAGES PREVIEW OF THE MANUAL:
VIDEO PREVIEW OF THE MANUAL:
PLEASE NOTE:
- This is not a physical manual but a digital manual – meaning no physical copy will be couriered to you. The manual can be yours in the next 2 mins as once you make the payment, you will be directed to the download page IMMEDIATELY.