Gleaner NA Harvesting 7000 & 8000 Grain Header Service Manual – PDF DOWNLOAD
FILE DETAILS:
Gleaner NA Harvesting 7000 & 8000 Grain Header Service Manual – PDF DOWNLOAD
Language : English
Pages : 498
Downloadable : Yes
File Type : PDF
Size: 204 MB
IMAGES PREVIEW OF THE MANUAL:
DESCRIPTION:
Gleaner NA Harvesting 7000 & 8000 Grain Header Service Manual – PDF DOWNLOAD
GENERAL INFORMATION:
TABLE OF CONTENTS:
Gleaner NA Harvesting 7000 & 8000 Grain Header Service Manual – PDF DOWNLOAD
GENERAL INFORMATION 1-3
Safety 1-3
Signal Words 1-4
Road and Highway Operation 1-6
Safety Lights and Reflectors 1-6
Safety Signs 1-9
Header Lift Cylinder Stop 1-11
Reel Lift Ram Stops 1-12
Shields 1-13
Header Transport Tie-Down 1-16
Installing Header on Combine 1-20
Leveling Header 1-24
Header Identification 1-24
Metric Information 1-26
Header Specifications 1-27
HEADER SPEED CHART AT RATED ENGINE SPEED 1-31
Combine with Standard Header Drive 1-31
Combine with Variable Speed Header Drive 1-31
Lubrication and Maintenance 1-32
Service 1-35
Special Tools 1-37
SICKLE REPLACEMENT 2-3
Removal – Sickle Drive Pin and Sickle 2-5
Inspection 2-7
Sickle Head Bearing Housing Assembly 2-11
Installation – Sickle and Sickle Drive Pin 2-13
SICKLE REGISTER 2-15
SICKLE SECTION REPLACEMENT 2-18
Standard Sickle 2-19
Clean Cut Sickle 2-22
4 pt Australian Sickle 2-24
SCH Sickle 2-26
GUARDS 2-30
Standard Sickle 2-32
Clean Cut Sickle 2-36
4 pt Australian Sickle 2-40
“SCH” Sickle 2-45
Wear Plates and Hold-down Clips 2-49
Standard Sickle 2-51
Clean Cut Sickle 2-55
4 pt Australian Sickle 2-59
“SCH” Sickle 2-63
CUTTERBAR ANGLE (RIGID HEADER) 2-68
Removal 2-68
Installation 2-69
FEATHER SHEETS (RAISED) 2-70
Maintenance and Operation 2-70
FEATHERED SHEETS (NON-RAISER) 2-74
Removal 2-75
Installation 2-76
CUTTERBAR (FLEX HEADER) 2-77
Removal 2-77
Installation 2-79
FRONT AND REAR FLEX HEAD FILLER PANELS (PAN END) 2-82
Removal 2-83
Installation 2-84
SKID PLATES (FLEX HEADER) 2-86
Removal 2-87
Plastic Skid Plates 2-96
Installation 2-97
AUTOMATIC HEADER HEIGHT CONTROL 2-105
General Information 2-105
Removal (Linkage) 2-106
Installation (Linkage) 2-108
Adjustment (Linkage) 2-110
LOWER STABILIZER ASSEMBLY (FLEX HEADER) 2-112
Removal 2-113
Installation 2-117
UPPER STABILIZER ASSEMBLY (FLEX HEADER) 2-121
Removal 2-121
Installation 2-122
CUTTERBAR GROUND PRESSURE SPRINGS (FLEX HEADER) 2-124
Removal 2-125
Installation 2-127
Adjustment 2-128
STABILIZER ASSEMBLY 2-130
Removal 2-131
Installation 2-133
CUTTERBAR TILT ARM (RIGID HEADER) 2-136
Removal 2-137
79022920 A Rev 2-1
DRIVE AND CUTTING COMPONENTS
Installation 2-140
Tilt Adjustment 2-144
CUTTERBAR TILT ARM AND STABILIZERS (FLEX HEADER) 2-146
Removal 2-14 7
Installation 2-151
Tilt Adjustment (Cutter Bar and Cutter Bar Stabilizers) 2-154
HEADER DRIVE 2-156
Removal 2-156
Disassembly 2-160
Inspection 2-164
Assembly 2-164
Installation 2-173
CONVEYOR DRIVE 2-177
Conveyor Drive Chain 2-178
Conveyor Slip Clutch 2-180
WOBBLE BOX DRIVE BELT 2-184
Removal 2-184
Installation and Adjustment 2-187
WOBBLE BOX 2-190
Removal 2-190
Disassembly and Inspection 2-194
Assembly 2-196
Installation 2-209
CONVEYOR 2-214
Conveyor Adjustments 2-214
Conveyor Finger and Guide Replacement 2-217
Conveyor Crankshaft, Finger Retainers, and Bearings 2-220
Right Hand Conveyor Shaft Replacement 2-227
Left Hand Conveyor Shaft Replacement 2-233
Flighting Extensions 2-237
Header Conveyor Replacement 2-240
Conveyor End Plate Replacement 2-244
Conveyor Straighten 2-246
DIVIDERS 2-247
Dividers (Rigid Headers) 2-247
Dividers (Flex Headers) 2-251
Divider Spring Replacement (Flex Header) 2-260
Long Wing Divider Option {Flex Header) 2-264
TROUBLESHOOTING FLEX HEAD VIBRATION PROBLEMS 2-268
Wobble Box Speed 2-268
Loose Parts 2-269
HOUSING 3-3
Header Weights {Transverse Combine) 3-3
Fairing Extension Replacement 3-5
Straw Retarder Wear Extension Replacement 3-12
Seal Strip Replacement {Transverse Header) 3-19
Seal Strip Replacement (Axial Header) 3-22
Rock Guard Replacement (Rigid Header) 3-25
Truss, Header Hanger, and Pan Back Replacement 3-26
Pan Bottom Replacement (Rigid Header) 3-46
Pan Bottom Replacement {Flex Header) 3-53
Left Hand Pan End Replacement 3-60
Right Hand Pan End Replacement 3-82
Lower Frame Replacement {Torque Tube) 3-95
GENERAL INFORMATION 4-3
Safety 4-3
Signal Words 4-4
Reflectors 4-6
Safety Signs 4-7
Header Lift Cylinder Stop 4-8
Reel Lift Ram Stops 4-9
Shields 4-10
Metric Information 4-12
Reel Specifications 4-13
Reel Speed Chart at Rated Engine Speed 4-14
Lubrication and Maintenance 4-15
Service 4-17
REEL HEIGHT ADJUSTMENT 4-19
BAT REEL 4-20
Removal 4-20
Inspection and Repair 4-22
Assembly and Installation 4-23
PICKUP REEL (HCC) 6 BAT “LEVEL 2” 4-29
Maintenance 4-29
Tine Pitch Adjustment 4-32
Removal 4-32
Inspection and Repair 4-34
Assembly and Installation 4-35
PICKUP REEL (UHC U-11) 6 BAT 4-45
General Information 4-45
Maintenance 4-45
Inspection and Repair 4-46
Removal 4-4 7
Inspection and Repair 4-50
Assembly and Installation 4-51
REEL ARM 4-60
Removal 4-60
Assembly 4-62
POWER (ELECTRIC) REEL ADJUSTMENT 4-65
Electrical Adjusting Motors 4-65
Specifications 4-66
Removal 4-68
Assembly 4-69
REEL DRIVE (HYDRAULIC) 4-71
Reel Speed 4-71
Reel Speed Control Valve 4-71
Torque Limiter (Adjustable Relief Valve) 4-72
Reel Motor and Chain 4-73
REEL LIFT CYLINDERS 4-85
VIDEO PREVIEW OF THE MANUAL:
PLEASE NOTE:
- This is the SAME MANUAL used by the dealerships to diagnose your vehicle
- No waiting for couriers / posts as this is a PDF manual and you can download it within 2 minutes time once you make the payment.
- Your payment is all safe and the delivery of the manual is INSTANT – You will be taken to the DOWNLOAD PAGE.
- So have no hesitations whatsoever and write to us about any queries you may have : heydownloadss @gmail.com
S.V