SIMON MP SERIES ELECTRO-PROPORTIONAL SERVICE MANUAL 89-100317 – PDF DOWNLOAD
IMAGES PREVIEW OF THE MANUAL:
TABLE OF CONTENTS:
SIMON MP SERIES ELECTRO-PROPORTIONAL SERVICE MANUAL 89-100317 – PDF DOWNLOAD
Introduction
Machine Specifications
- MP 40
- MP 60
- MP 80
Machine Component Locator
- Undercarriage Component Locator
- Superstructure Component Locator
- Boom Component Locator
- Platform Component Locator
Lubrication Chart
Section 1: Transportation and Emergency Procedures
- Transport the Unit
- Towing Procedures
- Truck or Trailer Transport
- Unloading Procedures
- Emergency System and Procedures
- Emergency Pumps
- Emergency Drive Function
- Emergency Lettering
Section 2: Hydraulic System
- Hydraulic Fluid
- Handling Precautions
- Fluid Recommendations
- Fluid Contamination Checks
- System Flushing Procedure
- Hydraulic System Components
- Electro-Proportional Circuit
- Hydraulic Pump
- Hydraulic Pump Adjustment
- Emergency Pump
- Emergency Pump Adjustment
- Ground Valve Bank Assembly
- Inlet Section
- End Cover (Adapter Manifold)
- Main Valve Segment
- Operation
- Maintenance
- Hydraulic Circuit Line Check
- Valves
- Drive Relief Valve
- Drive Valve Assembly
- Hi/Low Speed Drive Valve
- Flow Divider Valve Assembly
- Motion Control Valve Assembly
- Hydraulic Fluid Reservoir
- Hydraulic Reservoir Maintenance
- High Pressure Filter
- Boom Lift Valve Segment
- Flow Control Valve
- Flow Control Valve Adjustment
- Boom Telescope (Extend) System
- Boom Extend Valve Segment
- Pressure Relief Valve
- Telescope (Extend) Cylinder
- Mechanical Extend Function
- Superstructure Swing System
- Swing Valve Segment
- Swing Drive Motor/Reducer Assembly
- Worm Gear Type
- Planetary Gear Type with Integral Brake
- Swing Gear and Pinion Shaft Adjustment
- Swing Reducer/Motor Assembly Adjustment (MPSC)
- Worm Gear Type with Integral Brake (MP 80)
- Swing Drive Reducer Assembly Adjustment
- Swing Brake Assembly
- Platform Rotate System
- Rotate Control Valve
- Double Pilot Operated Check Valve
- Rotary Actuator
- Rotary Actuator Maintenance
- Platform Rotator Manifold
- Platform Level System
- Level Control Valve
- Double Pilot Operated Check Valve
- Master Level Cylinder
- Slave Level Cylinder
- Relief Valves
- Steer Valve Segment
- Hydraulic Swivel
- Steer Disconnect Knob
- Steer System Maintenance
Section 3: Drive System
- Drive System Components
- Drive Motor and Brake Assembly
- Drive Valve Segment
- Drive Valve Assembly
- Selector Valve
- Motion Control Valve Assembly
- Motion Control Valve
- Flow Control Valve
- Flow Divider Valve Assembly
- Flow Divider/Combiner Valve
- Gate (Globe) Valve
- Drive Relief Valve
- Brake Metering Valve
- Brake Metering Valve Adjustment
- Toggle Switch on the Pendant Control
- Platform Control Handle (Joystick)
Section 4: Electrical System
- Electrical System
- Battery Maintenance (in Storage)
- Battery Maintenance (in Use)
- Battery Preventive Maintenance
- Battery Replacement
- Movement Alarm
- Tilt Alarm
- Tilt Alarm Test
- Tilt Alarm Adjustment
- Relays 4-5
- Circuit Breakers
- Emergency Pump
- Emergency Stop Button
- Pendant Switch Removal
- Ground Control Cabinet Switch Removal
- Platform Console Switch Removal
- Drive/Steer Controller
- Boom Telescope Controller
- Boom Swing Controller
- Creep Speed Adjustments
- Boom Adjustment (Ground Control)
- Superstructure Swing Adjustment (Platform Control)
- Boom Hoist Adjustment (Platform Control)
Section 5: Mechanical Components
- Mechanical Components
- Tires
- Changing Tires
- Wheels and Lug Nuts
- Drive Hub Assembly
- Steer Cylinder Pins
- Rod End Cylinder Pin Replacement
- Base End Cylinder Pin Replacement
- Steer Cylinder
- Steer Cylinder Seal Replacement
- Tie Rod Assembly
- Tie Rod Assembly Replacement
- Superstructure
- Platform
- Hoses and Cables
- Miscellaneous Equipment
- Boom
- Boom Pivot Pin and Bushing Replacement
- Wear Pads
- Rear (Upper End) Wear Pad Replacement
- Front (Lower End) Wear Pad Replacement
- Boom Chain (For Three Piece Booms)
- Boom Chain Adjustment
- Boom Chain Replacement
- Boom Lift Cylinder
- Lift Cylinder Pivot Pin Replacement
- Lift Cylinder Seal Replacement (On Machine)
- Bench Replacement of Lift Cylinder Seals
- Holding Valve Inspection
- Boom Telescope (Extend) Cylinder
- Telescope (Extend) Boom Cylinder Pin Replacement
- Telescope (Extend) Cylinder Removal
- Telescope Cylinder Seal Replacement
- Telescope Cylinder Installation
- Holding Valve Inspection
- Platform Level Cylinders
- Platform Level Cylinder Pin Replacement
- Level Cylinder Seal Replacement
- Bleeding the Platform Leveling Circuit
- Tires
Section 6: Maintenance Schedule
- Maintenance Schedule
- General Maintenance Tips
- First Three Months of Operation
- Routine Servicing
- Daily Operational Checklist
- Monthly Operational Checklist
- Semi-Annual Operational Checklist
Section 7: Troubleshooting
- General Troubleshooting Tips
- Troubleshooting Chart
Index
Appendix
S.S 05/24