Massey Ferguson 18′ 20′ 22′ 25′ 30′ 35′ PowerFlow Cutting Table Repair Time Schedule Manual – PDF DOWNLOAD
FILE DETAILS:
Massey Ferguson 18′ 20′ 22′ 25′ 30′ 35′ PowerFlow Cutting Table Repair Time Schedule Manual – PDF DOWNLOAD
Size: 75.8 MB
Pages : 403
Format: PDF
Language: English
Brand: Massey Ferguson
Format: PDF
Language: English
Brand: Massey Ferguson
DESCRIPTION:
Massey Ferguson 18′ 20′ 22′ 25′ 30′ 35′ PowerFlow Cutting Table Repair Time Schedule Manual – PDF DOWNLOAD
TIME ALLOWANCE:
- All times listed in this publication are the result of careful study of the operation concerned. They represent the average time one trained dealer mechanic, of normal ability has taken to carry out the operation in a typical dealership, using standard workshop tooling and equipment, located for reasonable access and working conditions. They DO NOT include any travelling to or from the farm or site.
- The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended Massey Ferguson special tools shown in the Workshop Manual. No power tools are used and no short cuts are taken. The times are based on a second-hand machine in reasonable condition properly maintained using approved parts.
- Extra time may be required to deal with seized, rusted or damaged parts. This must be claimed for separately when carrying out warranty work. Allowances are included in the operation times quoted for setting up the combine in the workshop, obtaining all tools and parts, cleaning and testing after repair. Time required to remove and install mounted equipment which interferes with performing a specific job, is NOT INCLUDED in the time allowed.
Service tools:
Where a job requires recommended Massey Ferguson special service tools, the column in the time schedule identifies this. The tools required will be found and their use described in the Workshop Manual.
TABLE OF CONTENTS:
Massey Ferguson 18′ 20′ 22′ 25′ 30′ 35′ PowerFlow Cutting Table Repair Time Schedule Manual – PDF DOWNLOAD
- Dealer stocking list
- Cutter bar
- Table trailer
VIDEO PREVIEW OF THE MANUAL:
IMAGES PREVIEW OF THE MANUAL:
PLEASE NOTE:
- This is the same manual used by the DEALERSHIPS to SERVICE your vehicle.
- The manual can be all yours – Once payment is complete, you will be taken to the download page from where you can download the manual. All in 2-5 minutes time!!
- Need any other service / repair / parts manual, please feel free to contact us at heydownloadss @gmail.com . We may surprise you with a nice offer