Challenger EU Tractor MT945B MT955B MT965B MT975B Repair Time Schedule Manual – PDF DOWNLOAD
IMAGES PREVIEW OF THE MANUAL:
DESCRIPTION:
Challenger EU Tractor MT945B MT955B MT965B MT975B Repair Time Schedule Manual – PDF DOWNLOAD
TIME ALLOWANCE :
The times listed in this puЫication are the result of careful study of the operation concerned; they represent the average time ONE trained Dealer mechanic, of normal abllity has taken to carry out the operation in а typical Dealership, using standard workshop tooling and equipment, located for reasonable access and working conditions. They DO NOT include апу travelling to or from the farm or site.
- The machine is assumed to Ье clean and to Ье bare of апу extra equipment or attachment of поп AGCO manufacture, and delivered to ап authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available. The times given include difficulties encountered working оп used as opposed to new machines, and are based оп methods and recommended Special Tools shown in the workshop manual.
- The times are based оп а second hand machine in reasonable condition properly maintained using approved parts. Extra time may Ье required to deal with seized, rusted or damaged parts, which must Ье claimed for separately when carrying out warranty work. Allowances are included in the operation times quoted for setting up the machine in the workshop, oblaining all tools and parts, cleaning and testing after repair.
- Time required to remove and install mounted implements, such as loaders, hedge cutters, etc., which interfere with performing а specific job is NOT INCLUDED in the time allowed. The times given in this Repair Time Schedule are for а complete job from start to finish, including allowances for intermediated operations.
FILE DETAILS:
Challenger EU Tractor MT945B MT955B MT965B MT975B Repair Time Schedule Manual – PDF DOWNLOAD
Size : 36.2 MB
Format : PDF
Language : English
Brand: Challenger EU
Type of machine: Agricultural-Tractor
Type of document: Repair Time Schedule
Model: Challenger EU MT945B MT955B MT965B MT975B Tractor
Date: 9/6/2007
Number of Pages: 743 Pages
Part Number: AG332271A
TABLE OF CONTENTS:
Challenger EU Tractor MT945B MT955B MT965B MT975B Repair Time Schedule Manual – PDF DOWNLOAD
ENGINE INSTALLATION ARRANGEMENT
AIR INLET AND EXНAUST SYSTEM
COOLING SYSTEM
FUEL SYSTEM
ELECТRICAL AND STARTING SYSТEM
POWER TRAIN
POWER TRAIN ATTACHING
FRAМE AND BODY
STEERING SYSTEM
WНEELS
BRAКING SYSTEM
HYDRAULIC SYSTEM
DRA WВAR,TНREEPOINT НIТСН AND РТО
OPERATOR STATION
МARКINGS
VIDEO PREVIEW OF THE MANUAL:
PLEASE NOTE:
- This is the same manual used by the dealers to diagnose and troubleshoot your vehicle
- You will be directed to the download page as soon as the purchase is completed. The whole payment and downloading process will take anywhere between 2-5 minutes
- Need any other service / repair / parts manual, please feel free to contact [email protected] . We still have 50,000 manuals unlisted
S.V