Challenger EU Hay Equipment DKHD DKHDT Rotary Disc Header Repair Time Schedule Manual 79033102A – PDF DOWNLOAD
IMAGES PREVIEW OF THE MANUAL:
Challenger EU Hay Equipment DKHD DKHDT Rotary Disc Header Repair Time Schedule Manual 79033102A – PDF DOWNLOAD
Challenger EU Hay Equipment DKHD DKHDT Rotary Disc Header Repair Time Schedule Manual 79033102A – PDF DOWNLOAD
DESCRIPTION:
Challenger EU Hay Equipment DKHD DKHDT Rotary Disc Header Repair Time Schedule Manual 79033102A – PDF DOWNLOAD
A. TIME ALLOWANCE:
The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained dealer mechanic, of normal ability has taken to carry out the operation in a typical dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions. They DO NOT include any traveling to or from the farm or site.
- The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available. The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual.
- The times are based on a second hand machine in reasonable condition properly maintained using approved parts. Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair.
- Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time. The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.
B.TIMES :
All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.
TABLE OF CONTENTS:
Challenger EU Hay Equipment DKHD DKHDT Rotary Disc Header Repair Time Schedule Manual 79033102A – PDF DOWNLOAD
Description
Drives
Cutterbar
Electrical
Hay Conditioner
Frame and Shields
Hydraulics
Decal and Kits
VIDEO PREVIEW OF THE MANUAL:
PLEASE NOTE:
- This is the same manual used by the DEALERSHIPS to SERVICE your vehicle.
- The manual can be all yours – Once payment is complete, you will be taken to the download page from where you can download the manual. All in 2-5 minutes time!!
- Need any other service / repair / parts manual, please feel free to contact us at heydownloadss @gmail.com . We may surprise you with a nice offer
S.V