AGCO NA SL40A SL42A SL44A SL48A FL200A FL400A LOADER REPAIR TIME SCHEDULE MANUAL – PDF DOWNLOAD
$15.95
AGCO NA SL40A SL42A SL44A SL48A FL200A FL400A LOADER REPAIR TIME SCHEDULE MANUAL – PDF DOWNLOAD
Description
AGCO NA SL40A SL42A SL44A SL48A FL200A FL400A LOADER REPAIR TIME SCHEDULE MANUAL – PDF DOWNLOAD
FILE DETAILS:
AGCO NA SL40A SL42A SL44A SL48A FL200A FL400A LOADER REPAIR TIME SCHEDULE MANUAL – PDF DOWNLOAD
Language : English
Pages :28
Downloadable : Yes
File Type : PDF
Size:1.46 MB
DESCRIPTION:
AGCO NA SL40A SL42A SL44A SL48A FL200A FL400A LOADER REPAIR TIME SCHEDULE MANUAL – PDF DOWNLOAD
A. TIME ALLOWANCE
- The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained Dealer mechanic, of normal ability has taken to carry out the operation in a typical Dealership, using standard workshop tooling and equipment including air tools, located for reasonable access and working conditions.
- They DO NOT include any traveling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non “AGCO” manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
- The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended tools shown in the workshop manual. The times are based on a second hand machine in reasonable condition properly maintained using approved parts.
- Extra time may be required to deal with seized, rusted or damaged parts. Allowances are included in the operation times quoted for obtaining all tools and parts, cleaning and testing after repair. Diagnostic time is included in the time allowance unless a separate code is listed for diagonistic time.
- The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediate operations.
B.TIMES
All the operating times are presented in hours and the decimal parts of an hour. Decimal times must be used on all warranty claims. The times given in this repair time schedule are for a complete job from start to finish. Where access has been gained for an adjacent repair only the additional time for the second repair will be accepted and not the total time for the two failures.
C.REVIEW Of TIMESย
INTRODUCTION If you find any improvement in the method which reduces the time of an operation or you find you cannot meet an operation time after more than three attempts using the recommended method, a “Request for Review of Time” form (see next page) must be submitted quoting all relevant details. Photo copy the form and fax it to the following address:
TABLE OF CONTENTS:
AGCO NA SL40A SL42A SL44A SL48A FL200A FL400A LOADER REPAIR TIME SCHEDULE MANUAL – PDF DOWNLOAD
Section
Contents
Description
Base Machine
Mounting Kits
Hydraulics
Accessories 1 8
ACCESSORIES
3RD FUNCTION VALVE KIT 19
BALE SPEAR 25
BUCKET 22
FRONT PUMP KIT 21
GRAPPLE FORK 26
GRILL GUARD 27
PALLET FORK ATTACHMENT 23
QUICK ATTACH KIT 24
SELF LEVELi NG KIT 20
BASE MACHINE
MAIN FRAME 6
MAINFRAME 5
HYDRAULICS
CABLE CONTROLLED VALVE KIT 14
CYLINDER ASSY 13
HOSE KIT 16
JOYSTICK ASSY 18
PEDESTAL MOUNTED VALVE KIT 15
VALVEASY 17
MOUNTING KITS
COMPACT TRACTOR MOUNTING KIT 7
MID RANGE SUPPORT FRAME 12
MID RANGE TRACTOR MOUNTING KIT 10
UTILITY TRACTOR MOUNTING KIT 8
UTILITY TRACTOR SUPPORT FRAME 11
IMAGES PREVIEW OF THE MANUAL:

PLEASE NOTE:
- This is the same manual used by the DEALERSHIPS to SERVICE your vehicle.
- The manual can be all yours – Once payment is complete, you will be taken to the download page from where you can download the manual. All in 2-5 minutes time!!
- Need any other service / repair / parts manual, please feel free to contact us at heydownloadss @gmail.com . We may surprise you with a nice offer
S.M
What Our Customers Say
๐ Related Products
Discover more professional manuals for your equipment

AGCOยฎNA 8792-8776 Planter Repair Time Schedule Manual 79034636 A - PDF DOWNLOAD

AGCOยฎ NA 5545 5546 5556 Auto-Tie Round Baler Repair Time Schedule Manual 79032863A - PDF DOWNLOAD

AGCOยฎ NA Compact Tractor ST34A ST41A SERVICE MANUAL 79033000 A - PDF DOWNLOAD
