Ag Chem 874 1074 1074C 1274C 884 1084 1286C Rogator Chassis Repair Time Schedule Manual_AG331634C – PDF DOWNLOAD
$86.95 Original price was: $86.95.$36.95Current price is: $36.95.
Ag Chem 874 1074 1074C 1274C 884 1084 1286C Rogator Chassis Repair Time Schedule Manual_AG331634C – PDF DOWNLOAD
Description
Ag Chem 874 1074 1074C 1274C 884 1084 1286C Rogator Chassis Repair Time Schedule Manual_AG331634C – PDF DOWNLOAD
FILE DETAILS:
Ag Chem 874 1074 1074C 1274C 884 1084 1286C Rogator Chassis Repair Time Schedule Manual_AG331634C – PDF DOWNLOAD
Language : English
Pages : 1016
Downloadable : Yes
File Type : PDF
Size: 48.6 MB
IMAGES PREVIEW OF THE MANUAL:

DESCRIPTION:
Ag Chem 874 1074 1074C 1274C 884 1084 1286C Rogator Chassis Repair Time Schedule Manual_AG331634C – PDF DOWNLOAD
TIME ALLOWANCE :
The times listed in this publication are the result of careful study of the operation concerned; they represent the average time ONE trained Dealer mechanic, of normal ability has taken to carry out the operation in a typical Dealership, using standard workshop tooling and equipment, located for reasonable access and working conditions.
- They DO NOT include any travelling to or from the farm or site. The machine is assumed to be clean and to be bare of any extra equipment or attachment of non AGCO manufacture, and delivered to an authorized and duly equipped workshop where trained personnel and spare parts required to perform the operations are immediately available.
- The times given include difficulties encountered working on used as opposed to new machines, and are based on methods and recommended Special Tools shown in the workshop manual.
- The times are based on a second hand machine in reasonable condition properly maintained using approved parts. Extra time may be required to deal with seized, rusted or damaged parts, which must be claimed for separately when carrying out warranty work.
- Allowances are included in the operation times quoted for setting up the machine in the workshop, obtaining all tools and parts, cleaning and testing after repair.
- Time required to remove and install mounted implements, such as loaders, hedge cutters, etc., which interfere with performing a specific job is NOT INCLUDED in the time allowed.
- The times given in this Repair Time Schedule are for a complete job from start to finish, including allowances for intermediated operations.
TABLE OF CONTENTS:
Ag Chem 874 1074 1074C 1274C 884 1084 1286C Rogator Chassis Repair Time Schedule Manual_AG331634C – PDF DOWNLOAD
ENGINE GROUP
FRAME AND SUSPENSION GROUP
AXLE AND STEERING GROUP
FUEL SYSTEM GROUP
HYDRAULIC GROUP
AIR SYSTEM GROUP
CAB GROUP
AIR CONDITIONING AND HEATING GROUP
ELECTRICAL GROUP
LIGHTING GROUP
APPEARANCE GROUP
TIRE AND WHEEL GROUP
DECAL GROUP
GUIDANCE GROUP
OPTIONS GROUP
Contact us: [email protected]
https://vimeo.com/820059976?share=copy
PLEASE NOTE:
- This is the SAME exact manual used by your dealers to fix your vehicle.
- The same can be yours in the next 2-3 mins as you will be directed to the download page immediately after paying for the manual.
- Any queries / doubts regarding your purchase, please feel free to contact [email protected]
S.V
What Our Customers Say
🌟 Related Products
Discover more professional manuals for your equipment

1993-2006 Ag Chem RoGator Schematics Manual AG330809 - PDF DOWNLOAD

Ag Chem 3104 NMS TerraGator System Repair Time Schedule Manual_AG331632A - PDF DOWNLOAD

Ag Chem 1800 Gallon TerraGator Liquid System 2003 Service Manual_AG727534 - PDF DOWNLOAD
