1964-1973 Cessna 206 Series Parts Catalog Manual – PDF DOWNLOAD
IMAGES PREVIEW OF THE MANUAL:
DESCRIPTION:
1964-1973 Cessna 206 Series Parts Catalog Manual – PDF DOWNLOAD
INTRODUCTION.
This illustrated parts catalog has been prepared to aid
you in easily and quickly identifying parts of the models
covered herein.
This catalog features an index system consisting of:
l. An alphabetical index located in the front of the
catalog.
2. A numerical index located in the back of the
catalog, which Usts all parts and figures in
which they appear.
STANDARD PARTS.
Many parts having standard usage have been incorporated
into the Cessna Standard System. Parts in this
gro1Jp are designated with the part number prefix “S”.
For standard hardware items such as Tinnerman nuts,
clamps, etc., “AN” and “NAS” numbers have been
used.
USABLE ON CODES ..•. Serial Ustings in this catalog
are noted by a letter code located in the usable on code
column which is the extreme right hand column of the
parts Ust page. Usable on codes are appUcable only
to the figure on which they appear. The code letters
and the serials to which they apply are Usted at the
end of the figure.
If no usable on code appears opposite a first column
Usting of the figure, the usage is applicable to all
models and serials covered by this catalog. If no
usable on code appears opposite any indented Usting
the usage is appUcable to all models and serials cov~
ered by the figure on which it appears.
Bold face type serials appearing on certain figures are
for quick reference to large blocks of airplanes.
NO~-INTERCHANGEABLE PARTS …• When parts are
not 1_nterchangeable with earlier models, all parts
appllcable to the particular usage are Usted. The
letter code for the individual part usage is Usted in
the usable on column opposite each part. Care should
be exercised in determining proper serial when ordering
to insure receipt of correct part.
TABLE OF CONTENTS:
1964-1973 Cessna 206 Series Parts Catalog Manual – PDF DOWNLOAD
Menu……………………………………………………….. 0
Toolbar Help………………………………………………… 0
List of Parts Figures (Links)…………………………………. 0
Cover………………………………………………………. 1
Introduction………………………………………………… 5
Upholstery & Interior Trim……………………………………. 25
Alphabetical Index…………………………………………… 45
A………………………………………………………. 46
A (cont) – B…………………………………………….. 47
B (cont) – C…………………………………………….. 48
C (cont) – D…………………………………………….. 52
E – F…………………………………………………… 53
F (cont) – G…………………………………………….. 55
G (cont) – H…………………………………………….. 56
H (cont) – I…………………………………………….. 57
I (cont) – L…………………………………………….. 58
L (cont) – N…………………………………………….. 59
N (cont) – P…………………………………………….. 60
P (cont) – R…………………………………………….. 61
R (cont) – S…………………………………………….. 62
S (cont) – T…………………………………………….. 66
T (cont) – W…………………………………………….. 67
W (cont) – V…………………………………………….. 68
Parts Listing / Figures………………………………………. 69
1. Miscellaneous Bulk Items……………………………….. 72
1A. (Sheet 1) Stencils……………………………………. 74
1A. (Sheet 2) Stencils……………………………………. 75
2. Name Plates, Placards and Exterior Markings (Sheet 1)……… 76
2. Name Plates, Placards and Exterior Markings (Sheet 2)……… 77
2. Name Plates, Placards and Exterior Markings (Sheet 3)……… 78
2. Name Plates, Placards and Exterior Markings (Sheet 4)……… 79
2A. Name Plates, Placards and Exterior Markings (Sheet 1)…….. 83
2A. Name Plates, Placards and Exterior Markings (Sheet 2)…….. 84
2A. Name Plates, Placards and Exterior Markings (Sheet 3)…….. 85
2A. Name Plates, Placards and Exterior Markings (Sheet 4)…….. 86
2A. Name Plates, Placards & Exterior Markings. (Sheet 5)……… 91
3. Wing Assembly Complete…………………………………. 92
3A. Wing Assembly Complete………………………………… 98
4. Wing Structure Assembly…………………………………102
4A. Wing Structure Assembly………………………………106
5. Wing Leading Edges Installation………………………….110
5A. Leading Edge Assembly………………………………….112
6. Wing Spars Installation…………………………………114
6A. Wing Spars Installation………………………………..118
7. Wing Skins and Stringers Installation…………………….122
7A. Wing Skins and Stringers Installation……………………126
8. Fuel Tank Installation………………………………….128
8A. Fuel Tank Drain Valve Installation………………………131
9. Aileron Installation……………………………………132
10. Flap Installation……………………………………..134
11. Wing Strut Installation………………………………..138
11A. Wing Strut Installation……………………………….140
12. Fin and Dorsal Installation…………………………….142
13. Rudder Installation……………………………………146
13A. Floatplane Rudder Installation…………………………148
14. Stabilizer Installation………………………………..152
14A. Stabilizer Installation……………………………….154
15. Elevator Installation………………………………….158
15A. Elevator Installation…………………………………160
16. Fuselage Assembly……………………………………..164
16A. Fuselage Assembly…………………………………….166
17. Fuselage Front and Center Section Assembly……………….170
17A. Fuselage Front and Center Section Assembly………………172
18. Forward Fuselage Structure Assembly……………………..176
18A. Forward Fuselage Structure Assembly (Sheet 1 of 2)……….180
18A. Forward Fuselage Structure Assembly (Sheet 2 of 2)……….181
19. Lower Forward Fuselage Structure Assembly………………..186
19A. Lower Forward Fuselage Structure Assembly……………….190
19B. Lower Forward Fuselage Structure Assembly (Sheet 1)………194
19B. Lower Forward Fuselage Structure Assembly (Sheet 2)………195
20. Firewall Installation………………………………….200
20A. Firewall Installation…………………………………202
21. Firewall Grommets Installation………………………….206
22. Pedestal Installation………………………………….208
23. Front Doorpost and Bulkhead Assembly…………………….212
24. Rear Doorpost Assembly…………………………………216
24A. Rear Doorpost Assembly………………………………..218
25. Fuselage Belly Section Assembly…………………………220
25A. Fuselage Belly Section Assembly………………………..222
26. Main Landing Gear Bulkhead Assembly……………………..224
27. Lower Cabin Section Components………………………….226
27A. Lower Cabin Section Components…………………………230
27B. Lower Cabin Section Components…………………………232
27C. Lower Cabin Section Components…………………………236
28. Upper Aft Cabin Section Components………………………238
28A. Upper Aft Cabin Components…………………………….242
29. Cabin Floorboards Installation………………………….246
29A. Cabin Floorboard Installation………………………….248
29B. Cabin Floorboard Installation………………………….252
29C. Cabin Floorboards Installation…………………………254
30. Cargo Doors Installation……………………………….258
30A. Baggage Door Installation……………………………..262
31. Tailcone Installation………………………………….264
31A. Tailcone Installation…………………………………268
32. Aft Tailcone Assembly………………………………….272
32A. Aft Tailcone Assembly…………………………………274
33. Stinger Installation…………………………………..276
34. Windshield Installation………………………………..277
34A. Windshield Installation……………………………….278
35. Nose Gear Installation…………………………………280
35A. Nose Gear Installation………………………………..284
36. Nose Gear Shock Strut Assembly………………………….286
36A. Upper Strut Assembly – Nose Gear……………………….292
37. Nose Gear Wheel and Tire Assembly……………………….294
37A. Nose Gear Wheel & Tire Assembly………………………..296
38. Shimmy Dampener Assembly……………………………….298
38A. Shimmy Dampener Assembly………………………………299
39. Nose Gear Steering Installation…………………………300
40. Main Landing Gear Installation………………………….302
40A. Main Landing Gear Speed Fairing Installation…………….306
41. Main Landing Gear Wheel and Brake Installation……………310
41A. Cabin Door Installation……………………………….312
42. LH Cabin Door Installation……………………………..316
42A. RH Cabin Door Installation…………………………….322
42B. Removable Latch Assembly………………………………324
43. Removable Latch Assembly……………………………….328
43A. Cabin Door Panels Installation…………………………330
44. Cabin Top and Firewall Upholstery Installation……………334
44A. Cabin Top & Firewall Upholstery Installation…………….336
45. Floorboard and Cargo Compartment Upholstery Installation…..338
45A. Floorboard & Baggage Compartment Upholstery Installation….342
46. Cabin Doors and Side Panels Upholstery Installation……….344
46A. Cabin Side Panels Upholstery Installation……………….348
46B. Cabin Side Panels Upholstery Installation……………….350
47. Soundproofing Installation……………………………..353
47A. Cabin Soundproofing Installation……………………….354
48. Seating Arrangements (Sheet 2)………………………….357
48. Seating Arrangements (Sheet 1)………………………….358
49. Pilot and Co-Pilot Seat Installation (Sheet 1 of 2)……….360
49. Pilot and Co-Pilot Seat Installation (Sheet 2 of 2)……….361
49A. Pilot & Co-Pilot Seat Installation……………………..366
49B. Pilot & Co-Pilot Seat Installation……………………..368
49C. Pilot & Co-Pilot Seat Installation……………………..372
50. Vertically Adjustable Pilot & Co-Pilot Seat Installation…..374
50A. Vertically Adjustable Seat Bottom Frame Assembly…………378
50B. Pilot & Co-Pilot Power Adjustable Seat Installation………380
50C. Power Seat Bottom Assembly – Pilot & Co-Pilot……………384
50D. Infinitely Adjustable Front Seat Installation……………386
50E. Infinitely Adjustable Front Seat Installation……………390
50F. Infinitely Adjustable Front Seat Installation……………396
51. Middle Seat Installation……………………………….400
51A. Middle Seat Installation………………………………406
51B. Middle Seat Installation………………………………408
51C. Middle Seat Installation………………………………412
52. Aft Seat Installation………………………………….414
52A. Aft Seat Installation…………………………………418
52B. Ambulance Attendants Seat Installation………………….422
52C. Aft Seat Installation…………………………………424
52D. Aft Seat Installation…………………………………428
52E. Aft Seat Installation…………………………………430
53. Instrument Panel Equipment Installation………………….434
53A. Instrument Panel Equipment Installation…………………436
53B. Instrument Panel Equipment Installation…………………442
53C. Instrument Panel Equipment Installation…………………446
53D. Instrument Panel Equipment Installation…………………452
53E. Switch Panel Installation……………………………..458
53F. Switch Panel Installation……………………………..460
53G. Switch Panel Installation……………………………..461
54. Switch Panel Installation………………………………462
54A. Post Lighted Instrument Panel Installation………………464
54B. Post Lighted Instrument Panel Installation………………466
54C. Post Lighted Instrument Panel Installation………………468
54D. Post Lighted Instrument Panel Installation………………470
55. Map Compartment Installation……………………………472
55A. Glove Box Installation………………………………..474
55B. Instrument Panel Equipment Installation…………………476
55C. Switch Panel Installation……………………………..482
55D. Postlighted Instrument Panel Installation……………….484
55E. Glove Box Installation………………………………..487
55F. Instrument Panel Equipment Installation…………………488
56. Fuselage Equipment Installation…………………………494
56A. Rear View Mirror and Compass Installation……………….496
56B. Seat Belts & Shoulder Harness Installation………………500
57. Stretcher Installation…………………………………504
57A. Ambulance and Stretcher Provisions……………………..506
57B. Vertical Oxygen Bottle Installation…………………….508
58. Two Bladed Propeller Installation……………………….510
58A. Three-Bladed Propeller Installation…………………….512
58B. Three Bladed Propeller Installation…………………….514
58C. Two Bladed Propeller Installation………………………516
59. Two Bladed Propeller Assembly…………………………..518
60. Three Bladed Propeller Assembly…………………………522
61. Engine Cowl and Nose Cap Installation……………………524
61A. Engine Cowl and Nose Cap Installation…………………..528
62. Engine Installation……………………………………530
62A. Engine Installation – Turbocharged……………………..534
63. Engine Assembly……………………………………….536
63A. Engine Assembly – Turbocharged…………………………540
64. Induction Air Box Installation………………………….546
64A. Air Inlet Installation – Turbocharger…………………..548
64B. Turbocharger Installation……………………………..550
64C. Exhaust Valve and Controller Installation……………….554
65. Propeller Governor Assembly – Woodward…………………..556
65A. Propeller Governor Assembly – McCauley………………….558
66. Exhaust Stack Assemblies……………………………….560
66A. Exhaust Stack Assemblies………………………………562
67. Engine Baffles Installation…………………………….564
67A. Engine Baffles Installation……………………………568
68. Cowl Flaps System Installation………………………….570
68A. Cowl Flap Control System Installation…………………..574
69. Winterization Equipment Installation…………………….576
69A. Winterization Equipment Installation……………………577
69B. Winterization Equipment Installation……………………578
70. Cabin Ventilation System Installation……………………580
70A. Cabin Ventilation System Installation…………………..582
71. Cabin Heating System Installation……………………….586
71A. Cabin Heat and Defrost Installation…………………….588
72. Brake System Installation………………………………592
73. Brake and Rudder Pedals Installation…………………….596
74. Brake Master Cylinder Assembly………………………….598
75. Control Column Installation…………………………….600
75A. Control Column Installation……………………………604
75B. Control Wheel & Switches Installation…………………..610
75C. Control Wheel & Switches Installation…………………..612
76. Aileron Control System Installation……………………..614
76A. Wing Leveler Installation……………………………..618
76B. Wing Leveler Components……………………………….620
77. Elevator Control System Installation…………………….624
78. Elevator Trim System Installation……………………….628
78A. Elevator Electric Trim Components Installation…………..632
78B. Elevator Electric Trim Components Installation…………..634
79. Electric Flap System Installation (Sheet 1 of 2)………….638
79. Electric Flap System Installation (Sheet 2 of 2)………….639
79A. Flap Actuator Transmission and Motor Assembly……………643
79B. Flap Control Detail Installation……………………….644
79C. Flap Control Details Installation………………………648
80. Rudder Control System Installation………………………650
81. Rudder Trim System Installation…………………………652
82. Pitot System Installation………………………………654
83. Fuel System Installation……………………………….658
83A. Fuel System Installation………………………………662
84. Auxiliary Fuel Pump and Strainer Installation…………….666
84A. Auxiliary Fuel Pump & Strainer Installation……………..668
84B. Fuel Pump & Strainer Installation………………………670
85. Fuel Strainer and Strainer Drain Installation…………….672
85A. Fuel Strainer and Strainer Drain Installation……………674
85B. Fuel Selector Valve Installation……………………….676
86. Fuel Selector Valve Installation………………………..680
86A. Engine Primer System………………………………….682
86B. Engine Primer System………………………………….684
87. Oil System Installation………………………………..688
87A. Oil System Installation……………………………….690
88. Vacuum System Installation……………………………..694
88A. Vacuum System Installation…………………………….696
88B. Vacuum System Installation…………………………….700
88C. Gyros Installation – Engine Driven……………………..702
88D. Vacuum System Installation…………………………….706
88E. Directional & Horizontal Gyro Usage…………………….709
88F. Gyros Installation – Engine Driven……………………..710
89. Oxygen System Installation……………………………..712
89A. Oxygen System Installation (Sheet 1 of 2)……………….714
89A. Oxygen System Installation (Sheet 2 of 2)……………….715
89B. Oxygen System Installation…………………………….720
89C. Oxygen System Installation…………………………….724
89D. Oxygen System Installation…………………………….728
89E. Oxygen System & Console Components……………………..732
89F. Oxygen System Installation…………………………….736
90. Electrical Equipment Installation (Sheet 1 of 2)………….740
90. Electrical Equipment Installation (Sheet 2 of 2)………….741
90A. Electrical Equipment Installation………………………746
90B. Battery Box Installation – 24 Volt……………………..750
90C. Alternator Installation……………………………….752
90D. Alternator Installation – Shock Mounted…………………753
91. Instrument Panel Lights Installation…………………….754
91A. Map Light Installation………………………………..756
91B. Map Light Installation………………………………..758
91C. Instrument Panel Brow Lights Installation……………….760
92. Courtesy Light Installation…………………………….762
93. Rotating Beacon & Flashing Beacon Installation……………764
94. Cargo Pack Installation………………………………..766
95. Floatplane Fittings Installation………………………..768
96. Floatplane Fuselage Structure Details……………………774
97. Casket Carrier Installation…………………………….776
97A. Casket Carrier Installation……………………………778
98. Casket Platform & Rack Installation……………………..780
99. Casket Carrier Aft Cabin Structures Components……………782
100. Camera Plane Provisions Installation……………………784
101. Camera Plane Structure & Floorboard Installation…………788
102. Sky Diving Components Equipment Installation…………….792
Numerical Index………………………………………………795
PLEASE NOTE:
- This is the SAME manual used by the dealers to troubleshoot any faults in your vehicle. This can be yours in 2 minutes after the payment is made.
- Contact us at [email protected] should you have any queries before your purchase or that you need any other service / repair / parts operators manual.
S.V